§ 55.4. Requirements to submit a notice of intent.

353 words·~2 min read·/us/cfr/t40/s§ 55.4·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Prior to performing any physical change or change in method of operation that results in an increase in emissions, and not more than 18 months prior to submitting an application for a preconstruction permit, the applicant shall submit a Notice of Intent (“NOI”) to the Administrator through the EPA Regional Office, and at the same time shall submit copies of the NOI to the air pollution control agencies of the NOA and onshore areas adjacent to the NOA. This section applies only to sources located within 25 miles of States' seaward boundaries.
(b)The NOI shall include the following:
(1)General company information, including company name and address, owner's name and agent, and facility site contact.
(2)Facility description in terms of the proposed process and products, including identification by Standard Industrial Classification Code.
(3)Estimate of the proposed project's potential emissions of any air pollutant, expressed in total tons per year and in such other terms as may be necessary to determine the applicability of requirements of this part. Potential emissions for the project must include all vessel emissions associated with the proposed project in accordance with the definition of potential emissions in § 55.2 of this part.
(4)Description of all emissions points including associated vessels.
(5)Estimate of quantity and type of fuels and raw materials to be used.
(6)Description of proposed air pollution control equipment.
(7)Proposed limitations on source operations or any work practice standards affecting emissions.
(8)Other information affecting emissions, including, where applicable, information related to stack parameters (including height, diameter, and plume temperature), flow rates, and equipment and facility dimensions.
(9)Such other information as may be necessary to determine the applicability of onshore requirements.
(10)Such other information as may be necessary to determine the source's impact in onshore areas.
(c)Exploratory sources and modifications to existing sources with designated COAs shall be exempt from the requirement in paragraph (b)(10) of this section.
(d)The scope and contents of the NOI shall in no way limit the scope and contents of the required permit application or applicable requirements given in this part.
Connections37 cite this
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.